Four No's | Achieved by | Inspection stage | Concrete action |
|---|
Do not produce defects | QC + IPQC | First-article + in-process | First piece approved before production; SPC prevents drift |
Do not pass on defects | Self-check | First-article (self) | The producer inspects and signs; check as you go |
Do not accept defects | Mutual check | First-article (mutual) | The next process inspects and signs; reject upstream defects |
Do not ship out defects | OQC | Final (outgoing) | 100%/AQL sampling + triple match + stamped release |
The essence: defects are not "rescued" by any single process — four gates intercept them layer by layer, so they are never produced, never passed on, never accepted, and never shipped.
"Do not produce" is the first and most fundamental — a defect that never appears is the best kind.
First-article guards the start: new line, tooling or material change, stoppage over one day, or engineering change all require a first-article check before mass production;
IPQC guards the process: patrol inspection + SPC control charts watch tool wear, oven drift, and powder-batch changes; CPK≥1.33 means stable and controlled.
Key insight: "do not produce" relies on prevention and in-process control, not on sorting defects out afterward.
"Do not pass on" relies on self-check — the operator inspects the first piece (and in-process parts), checks dimension, appearance, and material as they go, and signs before handing to the next process.
The producer is the first owner of quality;
A self-check signature is a commitment: my process does not pass defects downstream.
Self-check makes every operator a quality gate, instead of pushing problems onto later inspection.
"Do not accept" relies on mutual check — the next process, on receiving parts, verifies material code, specification, quantity, appearance, and key dimensions, then signs to accept, returning any defect to the previous process.
The downstream process is the upstream's "customer," with both the right and duty to reject;
A mutual-check signature is a confirmation: what I receive is qualified.
Mutual check cuts the channel for defects flowing downstream — each process accepts only good parts.
"Do not ship out" relies on OQC — the final check before shipment:
Four verifications: label–order–product match, appearance, key dimensions, packaging and marking;
100% or AQL sampling: full inspection for critical parts, GB/T 2828.1 sampling for high volume;
Stamped release: inspect, stamp, mark, and place in designated areas for zero-defect outflow.
OQC turns "satisfying the customer" into "making the customer confident" — the customer's floor is the most expensive inspection, and whatever OQC misses becomes complaints, returns, and lost business.
DINGPRECISION performs laser cutting, punching, bending, welding, grinding, coating, silk screening, and assembly 100% in-house. Each of the eight process hand-offs is a "do not accept" mutual-check point; each operator's self-check is a "do not pass on" gate. On this self-operated chain, the Four No's become:
Three-level inspection: IQC (incoming) → IPQC (in-process) → OQC (outgoing), with first-article checks embedded at start-up;
Standards entered once: inspection drawings, patrol points, SOPs, and quality standards are entered into PLM once and synchronized on change, so every gate checks against the current standard;
Zero-defect outflow: for key customers, 100% inspection plus a per-batch inspection stamp;
System credentials: ISO 9001 / 14001 / 45001 certified; in 2026 DINGPRECISION passed a six-module, 80+ item audit by Swiss HMI manufacturer EAO.
DINGPRECISION's first value is "quality given away once is redeemed tenfold." The Four No's principle breaks that sentence into four executable actions: do not produce, do not pass on, do not accept, do not ship out.
Q1: What are the "Four No's"? A: Do not produce, do not pass on, do not accept, and do not ship out defective parts — four interception gates from source to delivery.
Q2: Which inspection implements each "No"? A: "Do not produce" is first-article + in-process inspection; "do not pass on" is self-check; "do not accept" is mutual check; "do not ship out" is OQC.
Q3: What is the difference between self-check and mutual check? A: Self-check is the operator checking their own product ("I don't pass defects on"); mutual check is the next process checking the previous one's work ("I don't accept defects in").
Q4: Why is "do not produce" the most fundamental? A: A defect that never appears is best. First-article prevents a wrong start, IPQC prevents mid-run drift — intercepting at the source costs least and risks least.
Q5: How do the Four No's relate to the inspection trilogy? A: The trilogy (first, in-process, final) defines when to inspect; the Four No's define what to check and what result to achieve. Together they form a complete quality loop.Request a Custom IP-Rated Enclosure Quote